
In Columbus, renting a boom lift for tilt-up panel erection in 2025 typically costs between $275–$550 per day, $1,100–$2,000 per week, and $3,900–$4,500 per month. These rates vary based on the lift's height and capacity. Leading vendors in Columbus provide a range of options suitable for different project sizes and requirements.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| BoomLiftRentalUSA.com (local partners) | $305 | $763 | 8 | Visit |
| Equipment Rental Pros | $348 | $884 | 8 | Visit |
| Aerial Lift Rental Pros | $331 | $819 | 7 | Visit |
| Lifts2Go | $275 | $475 | 7 | Visit |
| OHR Rents | varies | varies | 8 | Visit |
Several factors affect the cost of renting a boom lift in Columbus, including the lift's reach, weight capacity, and the duration of the rental. Additional costs may arise from delivery fees, fuel charges, and insurance options.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which can be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud may also apply. Late-return penalties and overtime charges should be considered when planning your rental period.

The boom lift rental market in Columbus is expected to remain competitive in 2025, with a steady demand driven by construction projects like tilt-up panel erection. Vendors are likely to offer flexible rental terms and competitive pricing to attract customers.
Ensure compliance with local safety regulations and operator certification requirements when renting boom lifts. Proper training and adherence to safety standards are crucial for successful and safe operations.
When planning a boom lift rental for tilt-up panel erection in Columbus, consider the specific needs of your project. The duration of the rental should align with the construction schedule, accounting for potential delays. Ensure the lift has the necessary reach and weight capacity for your panels. Plan for delivery and pickup logistics, especially in urban areas where access might be restricted. Proper staging areas for the lift and panels can streamline the workflow and minimize downtime.
Tip: Schedule the return of the boom lift promptly after use to avoid additional rental charges.