
In Philadelphia, renting a boom lift for solar panel installation in 2026 typically costs between $250–$700 and $250–$700, $700–$1,650, and up to $1,675–$3,425. These rates vary based on the lift's height and model. Leading rental companies in Philadelphia provide a range of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable | $232 | $603 | 8 | Visit |
| BoomLiftRentalUSA | $258 | $671 | 7 | Visit |
| EquipmentRentalPros | $270 | $750 | 7 | Visit |
| AerialLiftRentalPros | $263 | $685 | 7 | Visit |
| Tobly Equipment Rental | $410 | $900 | 6 | Visit |
Several factors affect the cost of renting a boom lift in Philadelphia. The type of boom lift, rental duration, and specific project requirements can all influence pricing. Additionally, seasonal demand and availability may impact rates.
When renting a boom lift, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat or mileage-based, fuel or recharge surcharges, and damage waivers versus full insurance. Cleaning fees for concrete or mud, late-return penalties, and overtime hours can also add to the total cost.

The boom lift rental market in Philadelphia is expected to grow in 2026, driven by increased construction and solar panel installation projects. Companies are expanding their fleets to meet demand, offering more competitive pricing and flexible rental terms.
Ensure compliance with local regulations when renting boom lifts. This includes operator certification and adherence to safety standards, which are crucial for avoiding fines and ensuring project safety.
When planning a boom lift rental for solar panel installation in Philadelphia, consider the specific needs of your project. The duration of the rental should align with the installation schedule, accounting for potential weather delays. Ensure the lift has the necessary height and reach capabilities, and consider any required attachments for handling solar panels. Plan for efficient staging and access to the installation site, and confirm delivery and pickup logistics to avoid delays. Proper cleanup and return conditions are essential to prevent additional charges.
Tip: Schedule delivery and pickup during off-peak hours to minimize traffic-related delays.