
Homeowners love the sleek look and easy maintenance of glass doors, but the true value is only clear when you know every cost in advance. CountBricks uses live material pricing, labor databases, and AI voice capture to generate accurate estimates in minutes, removing guesswork from residential construction budgeting.
• Modern, frameless glass instantly updates an older bathroom
• Tempered panels contain water more effectively than fabric curtains
• Increased perceived property value at resale
• Easier daily cleaning thanks to protective coatings
1. Glass Type and Thickness
Standard ¼-inch tempered glass is budget friendly, while ⅜-inch or ½-inch low-iron panels raise both material and handling costs.
2. Door Configuration
Sliding bypass doors are economical. Hinged or pivot designs need heavier hardware and often structural blocking behind the wall.
3. Hardware Finish
Chrome and brushed nickel are common, but matte black and custom finishes increase line-item pricing by 10-15 %.
4. Site Conditions
Out-of-plumb walls, tile repairs, or tub flange issues add prep time, disposal fees, and potentially waterproofing membranes.
5. Labor Market
Skilled glazing labor in Miami runs higher than the national average. CountBricks references real-time union and non-union rates to keep estimates current.
Through thousands of CountBricks quotes, an installed sliding glass door over a standard 60-inch tub averages $1,050 – $1,350. Frameless hinged systems trend between $1,600 – $2,400. Complex custom curbless tub platforms can exceed $3,000. These ranges already include demolition, glass, hardware, caulk, miscellaneous fasteners, and professional clean-up.
CountBricks is more than a calculator. Our platform captures spoken measurements, instantly pulls bathtub and wall dimensions from imported blueprints, and synchronizes with regional pricing APIs.
1. Open a new project and speak dimensions directly into the mobile app
2. AI converts voice data to numeric inputs and auto-detects door style
3. Real-time supplier feeds populate glass and hardware costs
4. Local labor rates are matched to scope and complexity
5. CountBricks applies mark-ups, sales tax, and permit fees
6. A branded PDF proposal and invoice are generated in less than 60 seconds
• Choose a stock finish that matches existing fixtures instead of custom powder-coat
• Consolidate multiple bathroom upgrades to save on mobilization fees
• Use CountBricks.com/services to compare live prices from several suppliers before ordering glass
• Request factory-applied protective coating; it reduces maintenance and callbacks
While confident homeowners can install framed kits, frameless glass demands precision cuts and heavy lifting. A single mis-drilled hole can shatter a $500 panel. CountBricks maintains a vetted installer network—searchable through your dashboard—to guarantee workmanship warranties alongside your digital estimate.
• Site measure: 1 hour
• Glass fabrication: 5-7 business days
• Installation: 2-4 hours for sliding doors, 4-6 hours for hinged
• Cure and caulk set time: 24 hours before first shower
Ask CountBricks to include optional pricing for grab bars, niches, and matching towel rings. Bundling today avoids tile patching tomorrow and locks in current labor rates.
Create your free account at CountBricks.com/estimate to generate an AI-powered quote, review detailed cost codes, and schedule installation—all before the next commercial break.

When the owners of a 2005 condo tower wanted to modernize 32 guest bathrooms, they needed tight cost control and minimal downtime. Traditional estimating would have taken a week and tied up the maintenance manager with site walks. Instead, CountBricks delivered fully scoped bathtub glass doors installation costs across all units in less than two hours.
• 32 sliding bypass glass doors, ¼-inch tempered, chrome hardware
• Five units required out-of-plumb wall shims—flagged automatically by blueprint takeoff
• Bulk material purchasing through CountBricks supplier integrations saved 11 % on glass panels
• Labor scheduled in weekend blocks, cutting resident disruption in half
The initial budget target was $46,000. CountBricks’ final AI quote came in at $42,800, including contingency and permit fees. By locking in supplier pricing via real-time feeds, the project avoided a mid-job glass surcharge that hit competing buildings the following month.
• Early digital site measures eliminate the classic “we’ll adjust on install day” overruns
• Stacking identical scopes creates economies of scale—CountBricks automatically groups tasks for optimum crew utilization
• Live dashboards let property managers approve change orders on their phones, keeping timelines intact
Whether you’re upgrading one master bath or an entire multifamily complex, tap into the same AI engine. Visit CountBricks.com/consultation to upload blueprints or book a 15-minute voice demo. Let CountBricks show you how fast, transparent, and accurate bathtub glass doors installation cost estimating can be.