
In 2026, renting a boom lift in Colorado Springs typically costs between $200–$1,000 and $200–$1,000 per day, $1,000 to $1,500 per week, and $1,300 to $7,000 per month. These rates vary based on the lift's height and model. Leading rental companies in the area provide a wide range of options suitable for various project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable | $213 | $555 | 8 | Visit |
| BoomLiftRentalUSA | $224 | $583 | 7 | Visit |
| EquipmentRentalPros | $260 | $678 | 7 | Visit |
| DOZR (Articulating Boom Lift) | $335 | $950 | 8 | Visit |
| DOZR (Towable Boom Lift) | $356 | $950 | 8 | Visit |
Several factors affect the cost of renting a boom lift, including the lift's reach, the rental duration, and the specific requirements of the job site. Seasonal demand and availability can also impact pricing.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Additional costs might include fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime charges.

The boom lift rental market in Colorado Springs is expected to remain competitive in 2026, with several vendors offering flexible rental terms and a variety of equipment. Staying informed about market trends can help in negotiating better rates and terms.
Ensure compliance with local safety regulations and standards when operating boom lifts. Proper training and certification are essential for safe operation and can prevent costly fines or project delays.
When planning a boom lift rental for sprinkler system installation in Colorado Springs, consider the specific needs of the project. The duration of the rental should align with the installation timeline, accounting for any potential delays. Ensure the lift has the necessary attachments for reaching high or awkward areas. Plan for efficient staging and access to minimize downtime. Confirm delivery and pickup logistics to avoid disruptions, and ensure the equipment is returned in clean condition to prevent additional charges.
Tip: Schedule the return of the boom lift immediately after project completion to avoid unnecessary rental extensions.