
In 2026, renting a boom lift in Colorado Springs for tilt-up panel erection typically costs between $213 and $626 per day, $555 to $1,812 per week, and up to $1,421 per month. These rates vary based on the lift's height and model. Leading vendors in the area provide a range of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable | $200–$1,000 | $555–$1,812 | 8 | Visit |
| BoomLiftRentalUSA | $224–$713 | $583–$2,116 | 7 | Visit |
| DOZR (Supplier Network) | $263–$423 | $950–$1,199 | 8 | Visit |
| United Rentals | $413–$1,001 | Varies (contact for quote) | 9 | Visit |
Several factors affect the cost of hiring a boom lift, including the lift's reach, the rental duration, and any additional features required for specific tasks. Seasonal demand and availability can also impact pricing.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime charges can also add to the total cost.

The boom lift rental market in Colorado Springs is expected to remain competitive in 2026, with several vendors offering flexible rental terms and a variety of equipment options. It's advisable to book in advance, especially during peak construction seasons, to secure the best rates and availability.
Ensure that all rented equipment complies with local safety regulations and that operators are properly trained and certified. This not only ensures safety but also avoids potential fines and project delays.
When planning a boom lift rental for tilt-up panel erection in Colorado Springs, consider the specific needs of your project. The duration of the rental should align with the panel erection schedule to avoid unnecessary costs. Ensure that the boom lift has the necessary reach and weight capacity for your panels. Plan for efficient staging and access to the site, and confirm that delivery and pickup times fit within your project timeline. Proper cleanup and return conditions should be discussed to prevent additional charges.
Tip: Confirm that all necessary attachments are included in the rental to avoid delays and additional costs.