
In 2026, renting a boom lift in Dallas for roof replacement projects typically costs between $250–$500 and $250–$500 per day. Weekly rates range from $1,000–$1,800, while monthly rentals can go up to $3,800, depending on the model and height requirements. Leading vendors in the area provide a variety of options to suit different project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable (via local partners) | $223 | $582 | 8 | Visit |
| BoomLiftRentalUSA.com (via local dealers) | $234 | $610 | 7 | Visit |
| Schaffer Equipment Rental | $275 | $775 | 8 | Visit |
| Schaffer Equipment Rental (85 ft diesel) | $475 | $1,400 | 8 | Visit |
| EZ Equipment Rental (DFW area) | $259 | $1,036 | 7 | Visit |
Several factors affect the cost of hiring a boom lift in Dallas. These include the lift's height and reach capabilities, the rental duration, and any additional features such as articulating arms or electric power. Seasonal demand and availability can also impact pricing.
When renting a boom lift, be aware of potential hidden fees. These may include delivery and pick-up charges, which can be flat rates or based on mileage. Fuel or recharge surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime hours can all add to the total cost.

The boom lift rental market in Dallas is expected to remain competitive in 2026, with several key players offering flexible rental terms and a wide range of equipment. Staying informed about market trends and vendor offerings can help you secure the best rates for your project.
Ensure that all rented equipment complies with local safety regulations and standards. Proper training and certification for operators are essential to maintain safety and compliance on the job site.
When planning a boom lift rental for roof replacement in Dallas, consider the specific needs of your project. The duration of the rental should align with the project timeline, accounting for potential weather delays. Ensure the lift has the necessary attachments for roofing tasks, and plan for efficient staging and access to the roof area. Consider the logistics of delivery and pickup, ensuring the site is accessible for large equipment. Proper cleanup and return conditions should be arranged to avoid additional fees.
Tip: Schedule the return of the boom lift promptly after project completion to avoid extra rental days.