
In 2026, renting a boom lift in Dallas for tilt-up panel erection typically costs between $250–$700 and $700 per day. Weekly rates range from $700–$1,650, while monthly rentals can reach up to $3,425. These prices vary based on the lift's height and model. Leading vendors in Dallas provide a variety of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Schaffer Equipment Rental | $349.99 | $1,400 | 8 | Visit |
| E-Z Equipment Rental (DFW) | $259 | $1,036 | 7 | Visit |
| Getable (Dallas boom lift marketplace) | $223 | $582 | 8 | Visit |
| BoomLiftRentalUSA.com (via local partners) | $234 | $610 | 7 | Visit |
| E-Z Equipment Rental (86' straight boom) | $657 | $1,902 | 7 | Visit |
Several factors affect the cost of renting a boom lift, including the lift's reach, weight capacity, and the rental duration. Additional costs may arise from delivery fees, fuel surcharges, and insurance options.
When renting a boom lift, be aware of potential hidden fees. Delivery charges can be flat or mileage-based, and there may be fuel or recharge surcharges. Consider whether a damage waiver or full insurance is more cost-effective. Cleaning fees for concrete or mud, late-return penalties, and overtime charges can also impact the total cost.

The boom lift rental market in Dallas is competitive, with numerous vendors offering flexible terms to meet the needs of construction projects. It's crucial to compare quotes and understand the terms of each rental agreement to ensure the best value.
Ensure that all rented equipment complies with local safety regulations and that operators are certified to use the machinery. This not only ensures safety but also avoids potential fines.
When planning a boom lift rental for tilt-up panel erection in Dallas, consider the specific requirements of this construction method. The duration of the rental should align with the project timeline, accounting for potential delays. Ensure the lift has the necessary reach and weight capacity for the panels. Proper staging and access to the site are crucial, as is coordinating delivery and pickup to minimize downtime. Hiring a boom lift with the right attachments can streamline the erection process and improve efficiency.
Tip: To avoid rental friction, ensure the boom lift is returned clean and in good condition to prevent additional charges.