
In Fresno, renting a boom lift in 2026 typically costs between $250–$450 and $300–$600 per day, $1,000–$1,700 per week, and up to up to $4,000 per month. These rates vary based on the model and height of the lift. Leading vendors in Fresno provide a wide range of equipment suitable for various job site requirements.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Aerial Lift Rental Pros | $323 | $798 | 8 | Visit |
| Equipment Rental Pros | $299 | $829 | 8 | Visit |
| BoomLiftRentalUSA.com | $226 | $589 | 7 | Visit |
| Getable | $217 | $566 | 7 | Visit |
| A1 Equipment Rentals | $325 | $1,050 | 7 | Visit |
Several factors affect the cost of renting a boom lift in Fresno, including the lift's height, the rental duration, and any additional features required. Seasonal demand and availability can also impact pricing.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel or recharge surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime hours can also add to the total cost.

The boom lift rental market in Fresno is expected to remain competitive in 2026, with several vendors offering flexible rental terms and a variety of equipment options. Understanding the local market trends can help in negotiating better rates and terms.
Ensure compliance with local safety regulations and standards when operating boom lifts. Proper training and certification may be required for operators to ensure safe and efficient use of the equipment.
When planning a boom lift rental for sprinkler system installation in Fresno, consider the specific needs of the project. The duration of the rental should align with the installation schedule, accounting for any potential delays. Ensure the lift has the necessary reach and attachments for accessing all areas of the site. Plan for efficient staging and access to minimize downtime. Confirm delivery and pickup logistics to avoid any disruptions to the workflow. Proper cleanup and return conditions should be established to prevent additional charges.
Tip: Schedule delivery and pickup during off-peak hours to avoid traffic delays and ensure timely project completion.