
In Mesa, renting a boom lift for curtain wall installation in 2026 typically costs between $200–$1,000 and $200–$1,000 per day, $600–$2,750 per week, and up to $1,300–$7,000 per month. These rates vary based on the lift's height and model. Leading rental companies in Mesa provide a wide range of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable | $233 | $607 | 8 | Visit |
| Equipment Rental Pros | $305 | $845 | 7 | Visit |
| BoomLiftRentalUSA | $267 | $696 | 7 | Visit |
| DOZR (Articulating Boom Lift via DOZR) | $791 | 8 | Visit | |
| Summit Rentals | $395 | $1,250 | 7 | Visit |
Several factors affect the cost of renting a boom lift in Mesa, including the lift's reach, weight capacity, and additional features like articulating arms. Seasonal demand and the duration of the rental period also play significant roles in pricing.
When renting a boom lift, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat rates or based on mileage. Fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime charges can also impact the total cost.

The boom lift rental market in Mesa is expected to grow steadily in 2026, driven by increased construction activities and infrastructure projects. Rental companies are expanding their fleets to include more energy-efficient models, catering to the growing demand for sustainable construction practices.
Ensure compliance with local safety regulations when operating boom lifts. Proper training and certification are essential for operators to minimize risks and adhere to OSHA standards.
When planning a boom lift rental for curtain wall installation in Mesa, consider the specific requirements of the job. The height and reach of the boom lift must match the building's dimensions, and you may need additional attachments for precise positioning. Plan for delivery and pickup logistics to ensure the lift is available when needed, and coordinate with your crew to optimize workflow. Proper staging areas and clear return conditions are crucial to avoid delays and additional costs.
Tip: Schedule the boom lift return immediately after project completion to avoid extra rental days.