
In Mesa, renting a boom lift in 2026 typically costs between $200–$1,000 and $200–$1,000 per day, $1,260–$1,755 per week, and up to $1,300–$7,000 per month. These rates vary based on the lift's height and model. Leading vendors in Mesa provide a wide range of options suitable for shingle roofing projects and other construction needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| BoomLiftRentalUSA | $267 | $696 | 8 | Visit |
| Getable | $233 | $607 | 8 | Visit |
| Equipment Rental Pros | $305 | $845 | 7 | Visit |
| Budget Boom Lift Rental | $264 | $688 | 7 | Visit |
| DOZR (Articulating Boom Lift) | $418 | $888 | 7 | Visit |
Several factors affect the cost of renting a boom lift in Mesa, including the equipment's reach, the rental duration, and any additional features required for specific tasks. Seasonal demand and availability can also impact pricing.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime charges can also add to the total cost.

The boom lift rental market in Mesa is expected to grow in 2026, driven by increased construction activities and infrastructure projects. Rental companies are expanding their fleets to include more versatile and energy-efficient models to meet diverse client needs.
Ensure compliance with local safety regulations and operator certification requirements when renting boom lifts. Proper training and adherence to safety standards are crucial for minimizing risks on the job site.
When planning a boom lift rental for shingle roofing in Mesa, consider the specific needs of your project. The duration of the rental should align with the roofing schedule to avoid unnecessary costs. Ensure the lift has the necessary attachments for shingle handling and that the site is prepared for delivery and pickup. Proper staging areas and access routes are crucial for efficient workflow, and the lift must be returned in clean condition to avoid additional fees.
Tip: Schedule the return of the boom lift promptly after project completion to avoid extra rental days.