
In Miami, renting a boom lift for siding installation in 2026 typically costs between $293 and $543 per day, $724 to $1,258 per week, and up to $1,840 to $2,795 per month. These rates vary based on the lift's height and model. Leading rental companies in Miami provide a range of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable (via local partners) | $207 | $540 | 8 | Visit |
| BoomLiftRentalUSA.com | $224 | $584 | 7 | Visit |
| Tobly | $575 | $1,265 | 7 | Visit |
| Aerial Lift Rental Pros | $320 | $791 | 7 | Visit |
| ABC Rentals | $285 | $689 | 6 | Visit |
Several factors affect the cost of renting a boom lift in Miami, including the lift's reach, the rental duration, and the specific requirements of the siding installation project. Additionally, seasonal demand and availability can impact pricing.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel or recharge surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime hours can also add to the total cost.

The Miami rental market for boom lifts is competitive, with several vendors offering flexible terms to accommodate various project needs. It's advisable to book in advance, especially during peak construction seasons, to secure the best rates and availability.
Ensure compliance with local safety regulations and obtain any necessary permits before commencing work with a boom lift. Proper training and certification for operators are essential to maintain safety standards on-site.
When planning a boom lift rental for siding installation in Miami, consider the specific needs of your project. The duration of the rental should align with the project's timeline, factoring in potential weather delays. Accessories such as safety harnesses and stabilizers may be necessary to ensure safe operation. Plan for efficient staging and access to the work area, and ensure clear paths for delivery and pickup. Proper cleanup and return conditions should be established to avoid additional fees.
Tip: Schedule the return of the boom lift promptly after project completion to avoid extra rental charges.