
In San Diego, renting a boom lift in 2026 typically costs between $200–$1,000 per day, $1,100–$2,000 per week, and up to $1,300–$7,000 per month. These rates vary based on the lift's height and model. Leading vendors in the area provide a wide range of options suitable for various project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable | $222 | $577 | 8 | Visit |
| BoomLiftRentalUSA | $232 | $605 | 7 | Visit |
| EquipmentRentalPros | $265 | $735 | 7 | Visit |
| Aerial Lift Rental Pros | $237 | $618 | 7 | Visit |
| Rubbl | $563 | $1,251 | 6 | Visit |
Several factors affect the cost of renting a boom lift in San Diego, including the equipment's reach, the rental duration, and any additional features required for specific tasks.
When renting a boom lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime charges can also impact the total cost.

The boom lift rental market in San Diego is expected to grow steadily in 2026, driven by increased construction activities and infrastructure projects. Rental companies are expanding their fleets to include more energy-efficient models, catering to the demand for sustainable equipment.
Ensure compliance with local regulations when renting boom lifts. This includes operator certifications and adherence to safety standards to avoid fines and ensure a safe working environment.
When planning a boom lift rental for sprinkler system installation in San Diego, consider the specific requirements of the job. The duration of the rental may vary depending on the complexity of the installation and site conditions. Ensure the lift has the necessary attachments for reaching high or awkward areas. Plan for efficient staging and access to minimize downtime. Confirm delivery and pickup logistics to align with your project schedule, and ensure the equipment is returned in clean condition to avoid additional fees.
Tip: Schedule the return of the boom lift promptly after project completion to avoid extra rental days.