
In San Jose, renting a boom lift for tilt-up panel erection in 2026 typically costs between $250–$550 per day, $1,100–$2,000 per week, and $3,500–$4,500 per month. These rates vary based on the lift's height and capacity. Leading rental companies in the area provide a range of options suitable for various construction needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Getable | $218 | $568 | 8 | Visit |
| BoomLiftRentalUSA | $213 | $554 | 7 | Visit |
| Aerial Lift Rental Pros | $217 | $566 | 7 | Visit |
| EquipmentRentalPros | $309 | $857 | 7 | Visit |
| Tobly Equipment Rental | $650 | $1,478 | 6 | Visit |
Several factors affect the cost of renting a boom lift in San Jose, including the lift's reach, weight capacity, and the duration of the rental. Additional features such as articulating arms or electric power can also impact pricing.
When renting a boom lift, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat or based on mileage. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud are also common. Late-return penalties and overtime charges should be considered in your budget.

The boom lift rental market in San Jose is competitive, with several vendors offering flexible terms to accommodate the growing construction industry. As demand for tilt-up panel erection increases, rental companies are expanding their fleets to include more advanced models.
Ensure compliance with local safety regulations when operating boom lifts. Proper training and certification are essential to avoid fines and ensure the safety of your crew.
When planning a boom lift rental for tilt-up panel erection in San Jose, consider the specific requirements of the job. The duration of the rental should align with the project timeline, accounting for potential delays. Ensure the lift has the necessary reach and weight capacity for the panels. Plan for efficient staging and access to the site, and confirm that delivery and pickup logistics are clear to avoid disruptions. Proper cleanup and return conditions should be established to prevent additional charges.
Tip: Schedule the boom lift return promptly after use to avoid additional rental days.