
In Omaha, renting a concrete mixer in 2026 typically costs between $100 and $100 per day, $350 to $1,200 per week, and $1,050 to $3,500 per month. These rates vary based on the mixer size and capacity. Leading rental companies in Omaha provide a range of mixers suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Resource Rental Center (Council Bluffs, IA – serves Omaha metro) | $100 | $350 | 7 | Visit |
| D & P Rentals | $80 | $320 | 7 | Visit |
| Taylor True Value Rental | $119 | $— | 6 | Visit |
| Alliance Tool Rental | $60 | $160 | 7 | Visit |
| County Line Rentals | $175 | $600 | 7 | Visit |
Several factors affect the rental costs of concrete mixers in Omaha, including the duration of the rental, the size and type of the mixer, and any additional services such as delivery and pick-up.
When renting a concrete mixer, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat or mileage-based, fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime charges.

The demand for concrete mixers in Omaha is expected to remain strong in 2026, driven by ongoing construction and foundation repair projects. Rental companies are likely to offer competitive rates and flexible rental terms to meet the needs of contractors and project managers.
Ensure compliance with local regulations when operating rented concrete mixers. This includes adhering to safety standards and obtaining any necessary permits for construction activities.
When planning a foundation repair project in Omaha, renting a concrete mixer requires careful consideration of several factors. The duration of the rental should align with the project timeline to avoid unnecessary costs. Consider the need for specific attachments or accessories that may be required for efficient mixing and pouring. Ensure that the site is prepared for delivery and pickup, with clear access paths for the equipment. Proper staging and cleanup are crucial to maintain workflow efficiency and meet return conditions.
Tip: Schedule the return of the concrete mixer promptly after use to avoid late fees and ensure availability for future projects.