Cost of Double Shower: CountBricks Residential Insights

Profile image of author
James Miller
Head of Sales

The Residential Reality Behind the Cost of a Double Shower

For construction professionals planning a double shower installation, understanding the cost of double shower setups is crucial. In 2025, installation costs range from $12,000 to $23,500, with luxury projects exceeding $30,000. CountBricks provides AI-driven estimates that consider real-time material pricing and local labor rates, helping contractors manage budgets effectively.

Primary Cost Drivers

• Framing and waterproofing upgrades for larger floor area
• Dual plumbing lines, valves, and drains
• Premium glass panels and dual doors
• High-end tile or stone finishes over increased square footage
• Skilled labor for complex layouts and recessed niches

Average Project Ranges in 2025

Nationwide averages for a complete double shower retrofit range between $12,000 and $23,500. In high-demand metro zones, costs can surpass $30,000, especially with custom features like body sprays and etched glass.

Breaking Down the Numbers with CountBricks AI

CountBricks estimates are built from real-time material pricing and trade labor rates. Here's a breakdown for a 6' x 4' double shower conversion:

• Demolition and disposal – 7%
• Structural reinforcement – 5%
• Plumbing rough-in – 18%
• Electrical (lighting, exhaust) – 4%
• Waterproofing membrane – 6%
• Tile or stone supply – 22%
• Glass, hardware, seals – 16%
• Finish carpentry and paint – 3%
• Labor overhead and project management – 19%

CountBricks updates line-item totals daily, eliminating outdated spreadsheets and guesswork.

Why a Double Shower Costs More than “Double”

Several complexities increase costs beyond simply doubling a single shower budget:

• Water supply must handle simultaneous users without pressure drop.
• Drains and slopes need redesign to comply with code.
• Larger glass spans require thicker panes and added bracing.
• Tile waste increases due to diagonal layouts and bench details.
• Extended construction timeline means higher labor overhead.

Smart Saving Strategies Recommended by CountBricks

1. Choose a semi-frameless enclosure for up to 15% glass savings.
2. Opt for large format porcelain instead of natural stone to reduce costs.
3. Keep plumbing on one wall to avoid re-routing vent stacks.
4. Schedule projects in a contractor’s shoulder season to negotiate reduced fees.
5. Use CountBricks.com to compare live supplier quotes before purchasing.

Step-by-Step Estimating with CountBricks Voice AI

1. Open the CountBricks app and select “Bathroom Remodel.”
2. Walk through the space while describing dimensions.
3. State desired finishes like “full height subway tile.”
4. The AI creates material, task, and cost stacks instantly.
5. Convert the estimate into a branded proposal for client signature.

Labor Considerations

Licensed plumbers and tile setters command the largest share of labor costs. A typical timeline includes:

• Day 1-2 – Demo and rough framing
• Day 3-5 – Plumbing and electrical rough-in
• Day 6-7 – Waterproofing cure time
• Day 8-12 – Tile set and grout
• Day 13 – Glass measurement
• Day 18 – Glass install and punch list

Using task-level Gantt charts, contractors can overlap trades to save time and costs.

Return on Investment for Homeowners

An upscale double shower returns 60-70% of its cost at sale, with faster absorption rates in newer homes. Builders report higher buyer satisfaction and reduced option fatigue.

Final Thoughts

The cost of double shower installation is influenced by design vision, regional labor swings, and material price shifts. CountBricks provides accurate estimates by integrating real-time data and AI-driven takeoffs. Whether you're a contractor or homeowner, start with an accurate number on CountBricks.com and build with confidence.

Our AI app can generate costed estimates in seconds.

Cost of Double Shower: CountBricks Residential Insights

CountBricks Case Snapshot: Double Shower Upgrade in Austin, TX

When the Martinez family requested a modern double shower, Horizon Homes partnered with CountBricks to manage costs. Here's a summary of the project:

Initial Estimate vs. Final Invoice

• AI estimate: $18,460
• Approved change orders: +$1,925
• Final invoice: $20,385
• Variance: 10.4% within the 12% contingency

Key Budget Wins

• Glass – Switching to clear low-iron saved $1,120.
• Layout – Keeping valves on the existing wet wall cut labor days.
• Tile – Large format porcelain reduced install hours by 18%.

Schedule Compression Techniques

1. CountBricks Blueprint AI allowed early material orders.
2. Overlapping plumber and electrician rough-ins saved time.
3. Early glass purchase avoided price hikes.

Client Feedback

“The final cost matched the first number we saw on the CountBricks screen,” Mrs. Martinez noted. “We loved watching the estimate update in real time when we added features. No surprises.”

How You Can Replicate This Success

• Start with a CountBricks voice estimate for transparency.
• Lock in materials when prices dip; the platform alerts you.
• Use CountBricks.com to showcase recent projects and speed approvals.
• Convert estimates into schedule-driven invoices for cash flow alignment.

Ready to control the cost of double shower installations? Visit CountBricks.com for a free AI estimate demo.