
Enhancing curb appeal and security with a custom driveway gate is a strategic investment for Sacramento properties. With installation costs ranging from $3,000 to $12,000 depending on materials and automation, CountBricks provides AI-driven estimates and expert guidance to ensure your project aligns with local climate and building codes.
Sacramento’s climate requires materials that withstand extreme temperatures and moisture. CountBricks offers finishes designed for durability, ensuring compliance with local codes and aesthetic preferences.
• Classic or modern designs
• Powder-coated for corrosion resistance
• Suitable for motorized systems
• Redwood or cedar on steel
• Combines aesthetics with strength
• Custom stain options
• Rust-resistant
• Extends motor life
• Various finishes available
1. Voice-First Consultation: Discuss your needs with our team.
2. Instant AI Estimate: Get a detailed cost breakdown.
3. Digital Blueprint Takeoff: Accurate measurements prevent rework.
4. Interactive Revisions: Adjust options and see real-time updates.
5. Fabrication & Install Scheduling: Seamless process from start to finish.
• Gate fabrication and patterning
• Corrosion-resistant hardware
• Concrete and post installation
• Electrical and smart-home integration
• Permit fees and inspections
• Final cleanup and walkthrough
• Solar-powered openers
• Wi-Fi camera intercoms
• Vehicle sensing loops
• UPS battery backups
• Rinse away chemicals seasonally
• Lubricate hinges biannually
• Test safety sensors monthly
• Schedule annual tune-ups
• Fabrication time: 4-6 weeks
• Permit requirements: Yes, we handle it
• Color matching: Available
• Material changes: Compare options easily
Visit CountBricks.com to explore our services and book a consultation. Experience the reliability and style of CountBricks driveway gates.

The Fernandez family sought a gate that combined historic charm with modern technology. CountBricks captured their preferences quickly, resulting in a seamless project.
• Design Selection: Laser-cut steel with oak leaf accents
• AI Costing: Estimated at $8,940
• Rapid Approval: Immediate fabrication and installation
Our blueprint takeoff identified a gas line conflict, allowing us to adjust plans and avoid delays.
1. Project completed in 22 days
2. Passed inspection on first attempt
3. High homeowner satisfaction with app control
• Predictable Costs: Locked in prices
• Fewer Surprises: Early conflict detection
• Integrated Support: Quality assurance from start to finish
Explore more success stories at CountBricks.com and book your consultation today.