
As electric vehicles dominate Bay Area streets, homeowners are racing to add reliable home charging. CountBricks is leading the way with fast, code-compliant installations and AI-driven estimates that eliminate surprises. Whether you drive a compact commuter EV or a luxury SUV, our residential construction experts design, permit, and install electrical vehicle chargers San Jose residents depend on—all while providing transparent costs in real time. This guide explains how CountBricks streamlines the process from first quote to first charge.
San Jose commuters log longer daily miles than most California cities, making overnight charging a necessity rather than a luxury. Public stations can be crowded, costly, or offline. Installing a dedicated charger at home offers three non-negotiable benefits:
• Convenience: Plug in after work and wake up to a full battery every morning.
• Savings: Residential utility rates are lower than most public DC fast chargers, especially with time-of-use plans.
• Property Value: Zillow-style studies show homes with EV infrastructure command higher resale prices in tech-forward neighborhoods like Willow Glen and Evergreen.
The City of San Jose follows California Electrical Code Article 625, requiring dedicated circuits, GFCI protection, and load calculations. HOA bylaws add an extra layer of approval for many townhomes and condos. CountBricks handles all paperwork through a digital permitting workflow integrated with the city’s portal. Our project managers track every inspector comment so your charger passes on the first visit, saving days of downtime.
1. Digital application submitted via CountBricks.com/services
2. City review and redline feedback (3-5 business days)
3. Revisions and resubmittal by CountBricks drafting team (1 day)
4. Permit issuance and inspection scheduling (1-2 days)
Most homeowners debate Level 1 vs. Level 2. CountBricks reviews your daily mileage, panel capacity, and future vehicle plans before recommending the best fit.
• Level 1 (120 V, 15 A) charges roughly 4-5 miles per hour—ideal for plug-in hybrids or low-mileage drivers.
• Level 2 (240 V, 40-50 A) delivers 25-35 miles per hour—perfect for full-battery EVs and multiple drivers.
• Smart Networked Stations add Wi-Fi energy monitoring, demand-response utility rebates, and smartphone scheduling.
Pro Tip: Even if you start with a Level 1 cord, have CountBricks run conduit sized for Level 2 amperage. Upgrading later then requires only a breaker swap.
No two driveways are alike. Conductor distance, panel location, and trenching requirements can swing budgets by thousands. CountBricks AI captures dimensions directly from your voice walkthrough and automatically pulls current material prices, labor rates, and municipal fees. Within minutes you receive a detailed line-item estimate with:
• Conduit length and gauge
• Breaker and receptacle specification
• Wall penetration or trench footage
• Permit cost and inspection allowance
Because pricing pulls live market data, you avoid the “quote shock” that plagues traditional contractors. View a sample at CountBricks.com/portfolio.
1. Voice Consultation: Speak with our estimator from your garage for real-time measurements.
2. Digital Design: Receive a 3D layout and load calculation within hours.
3. Permit Submission: CountBricks files all documents electronically.
4. Site Preparation: Our crew arrives, covers work areas, and confirms shut-off.
5. Electrical Rough-In: Conduit, cable pulls, and breaker installation.
6. Inspection and Sign-Off: City inspector verifies code compliance.
7. Commissioning: Charger is test-run, Wi-Fi paired, and homeowner trained.
Silicon Valley tech households often add solar arrays, battery storage, or second EVs. CountBricks designs panels with a 25% capacity buffer and installs oversized conduit where feasible. We document all work in an as-built packet stored in your CountBricks client portal for easy reference during future upgrades.
Integrated Platform: Our AI engine ties estimates, blueprint takeoffs, and invoicing into one dashboard.
Licensed Electricians: Every crew member carries C-10 certification and local safety training.
Guaranteed Timeline: Missed deadlines cost us—not you. Penalties are built into our contracts.
Transparent Pricing: Line items match the invoice dollar for dollar; no hidden “change order” surprises.
Book your voice consultation today at CountBricks.com/consultation and join hundreds of San Jose homeowners who trust our electrical vehicle chargers to keep life moving.

When the Tran family in Evergreen upgraded to two electric SUVs, their existing panel was maxed out. CountBricks stepped in with a turnkey solution that showcases the power of AI-driven residential construction.
• Two 50-amp Level 2 chargers installed in a tandem garage
• Main service upgrade from 125 A to 200 A using overhead utility drop
• Solar-ready sub-panel and battery backup conduit installed for future expansion
• Permit approval achieved in four business days thanks to digital plan check
1. AI Estimate Accuracy: The initial voice walkthrough predicted conduit length within 2 ft of the final as-built measurement, keeping material costs on target.
2. One-Day Panel Swap: Coordinated utility shut-down allowed the crew to replace the meter-main and energize the new chargers before sunset.
3. Utility Rebates: CountBricks completed the paperwork that earned the Trans a $1,200 San Jose Clean Energy rebate, applied directly to their final invoice.
• Charging time dropped from 17 hours on a shared 120 V outlet to under 4 hours per vehicle.
• The upgraded electrical infrastructure supports a planned 7 kW solar array—no additional trenching required.
• Real estate appraisal added $9,500 of home value attributed to EV readiness.
• Think Holistically: Combining charger installation with a panel upgrade often costs less than tackling them separately.
• Act Fast on Incentives: Municipal and utility rebates in San Jose change quarterly; CountBricks tracks them in real time.
• Document Everything: Digital as-built plans stored in your client portal simplify future solar or battery additions.
From single-car garages in Rose Garden to multi-bay estates in Almaden Valley, CountBricks applies the same data-driven methodology. Visit CountBricks.com/services to explore package options or schedule your personalized consultation.