How Much to Rewire a Mobile Home: Cost Guide

Price source: Costs shown are derived from our proprietary U.S. construction cost database (updated continuously from contractor/bid/pricing inputs and normalization rules).
Profile image of author
Eva Steinmetzer-Shaw
Head of Marketing

How Much Does It Cost to Rewire a Mobile Home?

For early budgeting, the existing article listed a broad mobile-home rewiring range of $3,000 to $12,000. Keep that as indicative legacy planning context only. It is not a verified current quote, and it should be checked against the home size, access conditions, electrical scope, permits, inspections, utility requirements, local labor, material costs, and the adopted rules that apply to the specific manufactured or mobile home.

A useful estimate starts by separating a full rewire from a limited repair or partial circuit replacement. A single-wide with open access may price very differently from an occupied double-wide where finished walls, ceilings, cabinets, or underbelly materials restrict access.

Mobile-Home Retrofit vs New-House Wiring

Rewiring a mobile or manufactured home is a retrofit scope. It is not the same as wiring a new site-built house while framing is open. For that separate scope, see the new-construction guide at how much to wire a new house.

Main Cost Drivers

  • Home size and sections: single-wide, double-wide, and larger homes change cable runs, access points, device counts, and setup time.
  • Partial vs full scope: replacing one unsafe circuit, adding grounded receptacles, correcting damaged wiring, or rewiring the whole home are different estimates.
  • Access: electricians may need to work through wall cavities, ceilings, cabinets, crawl/underbelly areas, exterior penetrations, or patched openings.
  • Panel, service, and utility scope: panel replacement, service equipment, meter work, disconnects, grounding and bonding work, utility coordination, and inspections should be priced separately where applicable.
  • Devices and fixtures: receptacles, switches, lights, smoke/CO devices, appliance circuits, HVAC connections, exterior circuits, and specialty loads affect materials and labor.
  • Permits and inspections: local authority requirements, manufactured-housing rules, plan review, inspection trips, and reinspection fees can change the final budget.
  • Repair work: wall, ceiling, flooring, skirting, vapor barrier, underbelly, trim, and paint repairs may be excluded from an electrical quote unless specifically listed.
  • Occupancy: working around furniture, residents, temporary power needs, pets, weather, and daily cleanup can add time.

How To Use The $6,000 Example

The prior copy mentioned a Las Vegas average around $6,000. This is retained only as an unverified legacy example from the old article. It should not be presented as a current local price, a completed CountBricks case study, or a quote for another home. Use it only as a reminder to request a written scope that lists labor, materials, permits, inspection assumptions, repair exclusions, and whether the work is partial or complete.

Draft costed estimates with AI assistance, then review before sharing.

How Much to Rewire a Mobile Home | CountBricks Costs

Mobile-Home Rewire Quote Checklist

This article is for cost planning and estimate scoping only. It is not DIY electrical instruction. Do not work on live circuits, open panels, change breakers, size conductors, alter grounding or bonding, or disconnect utility power based on an online article. Electrical work can involve shock, electrocution, fire, and explosion hazards, so the scope should be reviewed by a licensed or otherwise qualified electrical professional, the local authority having jurisdiction, the utility where service equipment is involved, and manufactured-housing requirements that apply to the home.

Federal manufactured-home construction and safety standards are published in 24 CFR Part 3280, but local enforcement, adopted electrical code editions, permitting, utility rules, and whether a home is pre-HUD-code, altered, relocated, or site-modified can change what is required. Treat code compliance as jurisdiction-specific.

Questions To Ask Before Accepting A Price

  • Is the estimate for diagnostic repair, partial rewiring, or a full home rewire?
  • Does it include panel, meter, service equipment, grounding, bonding, disconnects, smoke/CO devices, GFCI/AFCI requirements where applicable, and utility coordination?
  • Which walls, ceilings, cabinets, floors, skirting, or underbelly areas may be opened, and who restores them?
  • Are permits, inspections, plan review, reinspection fees, and final documentation included?
  • Is temporary power, daily cleanup, resident access, furniture moving, and weather protection included?
  • Are appliance circuits, HVAC equipment, exterior receptacles, porch/deck circuits, water-heater loads, laundry, kitchen, bath, and low-voltage work listed separately?
  • Are hazardous-material assessments needed before disturbing older finishes, insulation, or underbelly materials?
  • What assumptions would change the price after the electrician opens concealed areas?

Using CountBricks For Estimate Scope

CountBricks can help contractors organize scope, allowances, exclusions, and line items before a proposal is sent. Use CountBricks Estimates to separate electrical labor, materials, permits, access repairs, and alternates, then have the electrical scope reviewed before sharing it with a customer.

What Was Removed Or Qualified

The old article included unsupported or overly broad claims about real-time material pricing, precise instant estimates, universal copper-code requirements, nightly power restoration, insurance-premium reductions, appraisal increases, energy-efficiency gains, and a named Las Vegas case study. Those claims should not be used unless separate source records, project documentation, jurisdiction-specific code support, or verified customer evidence are recovered.