Labor Cost to Install Hardie Siding | Expert Guide

Profile image of author
James Miller
Head of Sales

Understanding Labor Cost to Install Hardie Siding

For construction professionals aiming to maximize profitability, knowing the labor cost for installing Hardie siding is essential. Typically, labor accounts for 35-55% of the overall siding project budget. This comprehensive guide provides insights into the key variables affecting labor expenses and methods to enhance estimation accuracy using advanced technologies.

Current Labor Rates for 2025

As of 2025, labor costs for Hardie siding installation vary significantly by region:

  • West Coast: $55-$70 per hour
  • Midwest: $38-$50 per hour
  • Southeast: $30-$40 per hour

Key Labor Components

  • Jobsite preparation - removing old cladding, inspecting sheathing, installing house wrap
  • Material staging - unloading, acclimating, and cutting boards
  • Panel installation - fastening boards, spacing joints, flashing openings
  • Trim work - corner boards, fascia, soffits, caulking, touch-ups
  • Cleanup - daily debris management, final cleanup

Average Crew Size and Productivity

A typical project employs a three-person crew with one siding lift. Experienced teams install 150-200 square feet per labor hour. Regional wage rates play a significant role in determining your labor budget.

Managing Regional Wage Variations

Labor costs vary based on region, travel time, and labor agreements. Keeping up-to-date with wage data is crucial for competitive and profitable bidding processes.

Utilizing Modern Estimating Tools

Advanced AI-powered tools simplify labor estimation by generating detailed labor sheets swiftly. Leveraging these technologies aligns real-time data, ensuring precise forecasting.

Labor Cost Analysis Example

For a 2,400 sq ft home near Charlotte, NC:

  • Prep & demo: 32 hours × $34/hr = $1,088
  • Panel install: 120 hours × $34/hr = $4,080
  • Trim & finish: 28 hours × $34/hr = $952
  • Cleanup: 8 hours × $34/hr = $272

Total labor cost: $6,392

With materials priced at $7,410, labor constitutes 46% of the total cost, aligning with national averages.

Five Pro Tips to Control Labor Cost

  • Optimize nail pattern counts to reduce excess labor.
  • Use pre-painted boards to minimize painting time.
  • Utilize siding lifts for enhanced efficiency on multi-story projects.
  • Plan around weather conditions to maintain pace.
  • Implement AI for precise takeoffs.

Accounting for Additional Costs

Be mindful of additional burdens such as workers' comp, taxes, and insurance, which can increase wages by 15-25%. Ensure your cost projections accurately reflect these factors.

Subcontract vs. In-House Crews

Opting for subcontractors influences overhead management, whereas employing internal crews provides better quality control. Assess the right balance for your project using dual costing scenarios.

Comprehensive Estimating Beyond Labor

Beyond labor, incorporate entire project scopes, including sheathing and paint, for comprehensive estimates delivered promptly.

Conclusion

Achieving profitability in labor-intensive projects relies on accurate estimation practices. Use AI for fast and precise labor assessments to streamline construction workflows. For more insights, visit our website.

Our AI app can generate costed estimates in seconds.

Labor Cost to Install Hardie Siding | CountBricks Guide

Case Study: Streamlining Estimates on a Coastal Project

A Wilmington-based contractor cut estimating times by 80% using advanced tools during a coastal remodel, enhancing bid accuracy under challenging conditions.

Challenges Overcome

  • Varying heights in cladding layers
  • Limited staging access
  • Elevated regional wages

Implemented Solutions

  1. Instant voice session initiation on-site
  2. Real-time AI takeoffs for siding and trims
  3. Incorporation of regional wage data
  4. Adjustment for reduced accessibility and challenging terrain

The results featured significant reductions in manual processing time and increased profitability, with labor set at $11,356 compared to material spending of $13,980.

Takeaways for Future Projects

  • Utilize voice-to-text for site recordings
  • Maintain separate wage settings
  • Align scheduling with crew availability
  • Regularly update productivity factors

Accurate labor estimation is achievable with the right tools, as demonstrated here. Visit our portfolio for more success stories.