November 14, 2025
 —  
Construction

CountBricks lead paint removal Birmingham experts

James Miller
Head of Sales

Are you a construction professional? Use AI to build and edit full estimates, quotes and bids.

Why Lead Paint Removal Matters for Birmingham Homes

Many Birmingham houses built before 1978 still contain lead-based paint beneath layers of newer coatings. When disturbed, those flakes or dust particles become a serious health hazard—especially for children and pregnant women. Removing or encapsulating lead paint is not a cosmetic upgrade; it is a safety requirement regulated by the EPA and the Alabama Department of Public Health. CountBricks specializes in residential lead paint removal Birmingham families can depend on for complete compliance and lasting peace of mind.

The CountBricks Difference

• AI-powered estimating ensures every square foot, labor hour and material cost is captured in real time.

• Voice-driven onsite walk-throughs let our project managers dictate findings directly into the CountBricks platform, generating an immediate, line-itemized estimate.

• Our certified lead-safe renovators follow strict containment and disposal protocols, keeping your household protected and your project approved.

• Integrated blueprint takeoffs tie abatement tasks to replacement finishes so you see the full path from demo to final coat.

Understanding the Lead Paint Removal Process

1. Risk Assessment & Testing

CountBricks begins with EPA-recognized XRF testing to confirm lead presence. Results are uploaded to CountBricks.com/services, where you can review digital documentation alongside a preliminary cost model.

2. Containment Strategy

We isolate the work zone with dust-tight barriers, negative air filtration and HEPA-filtered vacuums. Containment details appear in your project portal so you know exactly how we are protecting adjoining rooms.

3. Paint Stabilization or Removal

Depending on substrate condition and budget, CountBricks offers three approaches:

• Chemical stripping for thick layers that cannot be sanded.

• Wet scraping and HEPA sanding to minimize airborne dust.

• Encapsulation with high-build elastomeric coatings when removal is impractical.

4. Safe Disposal

All debris is bagged, labeled and transported to approved facilities. Chain-of-custody forms are stored in your CountBricks project file for future resale disclosures.

5. Surface Restoration & Repainting

Lead abatement does not end with removal. Surfaces are skim-coated, primed and brought to a paint-ready finish. Homeowners select zero-VOC paints via the CountBricks color catalog, and our crews apply durable topcoats that seal in long-term safety.

Cost Factors: What Influences Your Estimate?

Every Birmingham home is unique, but CountBricks sees common drivers that affect lead paint removal pricing:

• Square footage and number of coated layers

• Wall versus trim or window assembly complexity

• Access challenges in tight historic layouts

• Required encapsulation products and final finish grade

• Disposal volume and local landfill fees

Because our AI engine updates material pricing daily, your quote reflects the most current market rates—no hidden markups, no surprises.

Timeframe: How Long Will the Project Take?

Most single-family projects span 4–10 days:

1. Day 1: Testing and containment setup

2. Day 2–4: Active removal or encapsulation

3. Day 5: HEPA cleaning and clearance testing

4. Day 6–10: Surface repair, priming and paint application

Live timelines are available in your CountBricks dashboard, so you can coordinate family schedules confidently.

Regulations & Certifications

CountBricks crews are EPA Lead-Safe Certified Renovators. We file all required Renovation, Repair and Painting (RRP) notices on your behalf and schedule third-party clearance testing when mandated. Compliance paperwork is archived at CountBricks.com/portfolio for easy realtor or lending reference.

Financing & Incentives

Lead abatement may qualify for federal tax credits and local grants. Our estimating platform flags eligible line items and produces documentation to simplify your application. CountBricks also partners with financing providers offering low-interest home-improvement loans.

Why Homeowners Choose CountBricks for Lead Paint Removal Birmingham

• Single-source accountability from estimate to final paint

• Real-time communication through voice notes, photos and project milestones

• Transparent costing that adjusts automatically with scope changes

• Respectful crews who treat historic details with care

• 3-year workmanship warranty backed by CountBricks residential division

Get Started Today

Protect your family and preserve your Birmingham home’s value. Request a same-day voice walk-through at CountBricks.com/consultation or call our residential team to schedule an onsite assessment. With CountBricks’ AI precision and certified expertise, lead paint removal is safer, faster and more affordable than ever.

Our AI app can generate costed estimates in seconds.

Case Spotlight: Restoring a 1925 Avondale Bungalow

When the Harper family purchased their 1925 cottage, charming crown moulding hid five layers of cracking lead paint. They needed an abatement partner who could preserve historic details while meeting modern safety codes.

Scope at a Glance

• 1,400 sq ft of interior wall and trim removal

• Original plaster walls requiring skim-coat repair

• Complete repaint in period-correct colors

CountBricks Approach

1. Our estimator used the CountBricks voice app to capture room dimensions and fixture counts in under 18 minutes, generating a 42-line item quote before leaving the property.

2. Certified technicians erected negative-pressure containment, then wet-scraped and HEPA-sanded trim profiles to retain crisp edges.

3. Debris weight was logged into the CountBricks disposal tracker, helping the Harpers secure a neighborhood preservation grant.

4. After clearance testing, finish carpenters re-caulked gaps, and painters applied a zero-VOC eggshell topcoat approved by the local historical commission.

Outcome

• Project completed in 7 working days—three ahead of schedule

• Final cost variance: +0.8% versus the initial AI estimate

• Lead clearance readings measured 87% below EPA thresholds

• Home value increased by an appraised \$24,000 after renovation

Pro Tips for Birmingham Homeowners

• Book early: Spring humidity slows drying times; winter slots fill fast.

• Request digital daily logs through the CountBricks client portal to track progress from your phone.

• Pair lead removal with energy-efficient window upgrades to maximize grant eligibility.

Ready to protect your family and enhance your property? Explore more success stories at CountBricks.com/portfolio or secure your personalized quote at CountBricks.com/consultation.