In Dallas, renting a mini excavator for retaining wall construction in 2026 typically costs between $200 and $283 per day, $698 to $1,155 per week, and $1,790 to $2,108 per month. These rates vary based on the model, size, and additional attachments required. Leading rental companies in Dallas provide a wide range of options to suit different project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Equipment Rental Pros (via EquipmentRentalPros.com) | $283 | $698 | 8 | Visit |
| DOZR (local/regional partners) | $289 | $1,155 | 8 | Visit |
| EZ Equipment Rental (Takeuchi TB230R) | $215 | $860 | 7 | Visit |
| EZ Equipment Rental (Yanmar VIO50) | $295 | $1,180 | 7 | Visit |
| Lift & Load Rentals (Deere 35G) | $350 | $1,000 | 8 | Visit |
Several factors affect the rental costs of mini excavators, including the machine's size, the duration of the rental, and any additional features or attachments. Seasonal demand and availability can also impact pricing.
When renting a mini excavator, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for excessive dirt or mud can also add to the total cost. Late-return penalties and overtime charges should be considered as well.

The rental market for mini excavators in Dallas is expected to remain competitive in 2026, with a steady demand driven by construction projects like retaining walls. Rental companies are likely to offer flexible terms and a variety of models to meet the needs of contractors.
Ensure compliance with local regulations when operating mini excavators. Proper training and certification may be required for operators, and safety guidelines must be followed to prevent accidents and ensure efficient project completion.
When planning a mini excavator rental for retaining wall construction in Dallas, consider the specific requirements of your project. The duration of the rental should align with the project's timeline, accounting for potential delays. Ensure the excavator is equipped with the necessary attachments for digging and lifting heavy materials. Plan for efficient staging and access to the construction site, and clarify delivery and pickup logistics with the rental company to avoid disruptions. Proper cleanup and return conditions should be discussed to prevent additional charges.
Tip: Schedule equipment delivery during off-peak hours to avoid traffic delays and ensure timely project start.