
Renting a mini excavator in Omaha for basement waterproofing projects in 2026 typically costs between $327 and $367 per day, $876 to $1,500 per week, and $2,207 to $3,577 per month. These rates vary based on the model, size, and additional attachments required. Leading rental companies in Omaha provide a wide range of options to suit different project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| EquipmentRentalPros (aggregator) | $367 | $905 | 8 | Visit |
| MiniExcavatorDirect | $327 | $600 | 7 | Visit |
| Midwest Rentals | $350 | $1,050 | 7 | Visit |
| Resource Rental Center (Bobcat E‑10) | $225 | $700 | 8 | Visit |
| Rubbl (Bobcat E35I) | $329 | $730 | 7 | Visit |
Several factors affect the rental costs of mini excavators, including the duration of the rental, the specific model and its capabilities, and the time of year. Demand can fluctuate, impacting availability and pricing.
When renting a mini excavator, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime hours can also add to the total cost.

The rental market for mini excavators in Omaha is expected to remain robust in 2026, driven by ongoing construction and renovation projects. Rental companies are expanding their fleets to include more fuel-efficient and technologically advanced models, which may influence rental rates.
Ensure compliance with local regulations when operating rental equipment. Proper training and certification may be required for operators, and adhering to safety standards is crucial to avoid fines and ensure project safety.
When planning a mini excavator rental for basement waterproofing in Omaha, consider the specific needs of the project. The duration of the rental should align with the project timeline, accounting for potential delays due to weather or site conditions. Ensure the excavator is equipped with the necessary attachments for digging and trenching. Plan for efficient staging and access to the work area, and coordinate delivery and pickup to minimize downtime. Proper cleanup and return conditions should be established to avoid additional fees.
Tip: Schedule equipment return promptly after project completion to avoid additional rental charges.