
In 2026, renting a mobile crane in Dallas for tilt-up panel erection typically costs between $1,200–$2,500 per day and $1,200–$2,500 per day, $5,000–$10,000 per week, and $15,000–$30,000 per month. These rates vary based on crane capacity, rental duration, and specific project requirements.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| North Texas Crane Rental Service | $800–$1,500 per day | $5,600–$10,500 per week | 8 | Visit |
| H&E Equipment Services (now Herc Rentals) | $800–$1,500 per day | $5,600–$10,500 per week | 8 | Visit |
| United Rentals | $800–$1,500 per day | $5,600–$10,500 per week | 7 | Visit |
Several factors affect the cost of hiring a mobile crane in Dallas, including the crane's lifting capacity, the duration of the rental, and any additional services required, such as operator fees or specialized rigging.
When renting a mobile crane, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers versus full insurance, cleaning fees for concrete or mud, late-return penalties, and overtime hours can also impact the total cost.

The mobile crane rental market in Dallas is competitive, with several vendors offering a range of equipment suitable for various construction needs. Understanding the specific requirements of your project and communicating them clearly to potential vendors can help in securing the best rates.
Ensure that all hired equipment complies with local safety regulations and that operators are certified to handle the machinery. This not only ensures safety but also avoids potential fines or project delays.
When planning a mobile crane rental for tilt-up panel erection in Dallas, consider the specific needs of this construction method. The duration of the rental may vary depending on the size and complexity of the panels. Ensure that the crane has the necessary attachments for precise lifting and positioning. Plan for efficient staging and access to the site, as well as clear paths for delivery and pickup. Proper coordination with your crew is essential to streamline workflow and minimize downtime.
Tip: Schedule crane return promptly after use to prevent extra rental fees and ensure availability for future projects.