
Renting a mobile crane in Miami for tilt-up panel erection in 2026 typically ranges from $525–$2,025 per day, $3,250–$9,750 per week, and $3,250–$9,750 per week. These rates depend on the crane's capacity, reach, and the specific requirements of the project. Leading vendors in Miami provide a variety of cranes suitable for different construction needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Sims Crane & Equipment | $525–$2,025 | $3,250–$9,750 | 9 | Visit |
| Herc Rentals | $525–$2,025 (estimated for mobile crane category) | $3,250–$9,750 (estimated) | 8 | Visit |
| Ring Power | $525–$2,025 (estimated for mobile crane category) | $3,250–$9,750 (estimated) | 8 | Visit |
Several factors affect the cost of hiring a mobile crane, including the crane's lifting capacity, the duration of the rental, and any additional services required, such as operator fees or specialized rigging.
When renting a mobile crane, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud can also add to the total cost. Late-return penalties and overtime hours should be considered in the budget.

The mobile crane rental market in Miami is expected to grow, driven by increased construction activities. Companies are investing in advanced cranes to meet the demand for efficient and safe operations. Regulatory compliance and safety standards are crucial factors influencing rental practices.
Ensure that all rented equipment complies with local safety regulations and standards. Proper certification and maintenance records should be verified before hiring.
When planning a mobile crane rental for tilt-up panel erection in Miami, consider the specific requirements of this construction method. The duration of the rental may vary depending on the size and complexity of the panels. Ensure that the crane has the necessary attachments for lifting and positioning panels accurately. Plan for efficient staging and access to the site, as well as clear pathways for delivery and pickup. Proper coordination with the crew is essential to streamline workflow and minimize downtime.
Tip: Schedule crane delivery during off-peak hours to avoid traffic delays and ensure timely setup.