
Renting a mobile crane in Seattle for generator installation in 2025 typically costs between $1,200 and $2,500 per day, $5,000 to $10,000 per week, and $15,000 to $30,000 per month. These rates vary based on crane capacity, rental duration, and specific project requirements.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Bigge Crane & Rigging Co. | $1,200 | $6,000 | 8 | Visit |
| United Rentals | $1,000 | $5,000 | 7 | Visit |
| Snell Crane Service | $1,100 | $5,500 | 8 | Visit |
| Crane Compare (Seattle listings) | $1,000 | $5,000 | 7 | Visit |
Several factors affect the cost of hiring a mobile crane in Seattle, including the crane's lifting capacity, the complexity of the job site, and the duration of the rental. Additional costs may arise from specialized rigging or operator fees.
When renting a mobile crane, be aware of potential hidden fees such as delivery and pick-up charges, which can be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud may also apply. Late-return penalties and overtime hours can further increase costs.

The Seattle market for mobile crane rentals is competitive, with several vendors offering a range of equipment suitable for various industrial applications. Understanding the specific needs of your project and negotiating terms can lead to cost savings.
Ensure compliance with local regulations and safety standards when hiring a mobile crane. This includes verifying operator certifications and adhering to site-specific safety protocols.
When planning a generator installation in Seattle, renting a mobile crane requires careful consideration of several factors. The duration of the rental should align with the installation schedule to avoid unnecessary costs. Consider the need for specific attachments that may be required for lifting and positioning the generator. Ensure that the site is prepared for crane access and staging, and plan for efficient cleanup and return conditions to meet rental agreements. Coordination with delivery and pickup schedules is crucial to maintain workflow efficiency.
Tip: To avoid rental friction, ensure the crane is returned in clean condition and within the agreed time window to prevent additional charges.