In Akron, Ohio, the cost for retaining wall projects is approximately $36 to $39 per square foot for poured concrete systems, which includes labor and materials. When using medium-grade materials like interlocking concrete blocks, the cost can range from $20 to $39 per square foot based on project complexity. For a standard 4 ft tall, 25 ft long wall (100 sf), costs range between $3,600 and $3,900. Labor crews typically charge $50–$75 per hour, accounting for 40-60% of the total project cost.
| Component | Cost Range (USD) | Notes |
|---|---|---|
| Poured Concrete Wall | $36–$39 per sf | Includes labor and materials |
| Interlocking Block | $20–$39 per sf | Gravity-set, standard trade assembly |
| Average Crew Labor | $50–$75 per hour | Skilled construction crew rate |
| Typical 100 sf Wall Installed | $3,600–$3,900 | Based on median for poured concrete |
To avoid inflated bids, maintain precise cost control: use current rates, separate labor and materials costs, and consider site challenges. Track crew hours and model scenarios to hone estimates. For instance, a $75/hour crew rate on a 16-hour job yields $1,200 in labor for a straightforward 100 sf wall, but if conditions are optimal, costs could be reduced to $800, saving 33%.
In Akron, expect a labor-inclusive price of $36–$39 per sf for concrete and $20–$39 per sf for block systems. Crew labor typically ranges from $50–$75/hour, constituting 40-60% of total costs. This structured approach aids in precise estimates and competitive bidding.

Here's a practical cost scenario for installers: