Ripper Attachment Rental Atlanta | Guide 2026

Price source: Costs shown are derived from our proprietary U.S. construction cost database (updated continuously from contractor/bid/pricing inputs and normalization rules).
Profile image of author
Eva Steinmetzer-Shaw
Head of Marketing

Ripper Attachment Rental Rates Atlanta 2026

Renting a ripper attachment for graders in Atlanta in 2026 typically costs between $50–$75 per day, $150–$200 per week, and $600–$800 per month. These rates vary based on the attachment size and compatibility with different grader models. Leading rental companies in Atlanta provide a range of options to suit various project needs.

Vendor Daily Rate Weekly Rate Review Score Website
Bobcat of Atlanta $50 $150 8 Visit
Eastpoint Equipment Rentals $50 $150 7 Visit
Sunbelt Rentals $— $— 8 Visit

Factors Influencing Ripper Attachment Hire Prices

Several factors affect the rental costs of ripper attachments, including the duration of the rental, the specific model required, and the availability of attachments during peak construction seasons.

Hidden-Fee Breakdown

When renting ripper attachments, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Additional costs can include fuel surcharges, damage waivers versus full insurance, cleaning fees for excessive dirt or mud, late-return penalties, and charges for overtime hours.

Our AI app can generate costed estimates in seconds.

ripper and attachment in construction work

Ripper Attachment Rental Market Insights 2026

The market for ripper attachment rentals in Atlanta is expected to grow in 2026, driven by increased construction activities. Rental companies are expanding their inventories to meet demand, offering flexible rental terms and competitive pricing.

Regulatory Compliance Note

Ensure compliance with local regulations when using ripper attachments. Proper training and certification may be required for operators, and adherence to safety standards is crucial to avoid fines and ensure project safety.