Rock Drill Rental San Antonio | Guide 2026

Price source: Costs shown are derived from our proprietary U.S. construction cost database (updated continuously from contractor/bid/pricing inputs and normalization rules).
Profile image of author
Eva Steinmetzer-Shaw
Head of Marketing

Rock Drill Rental Rates San Antonio 2026

In San Antonio, renting a rock drill for retaining wall construction in 2026 typically costs between $150 and $300 per day, $600 to $1,200 per week, and $2,000 to $4,500 per month. These rates vary based on the drill's power and size. Leading local vendors offer a variety of models suitable for different project scales.

Vendor Daily Rate Weekly Rate Review Score Website
Wolverine Rental and Supply $55 $165 8 Visit
Deaney Equipment $50 $200 7 Visit
Macandales $36 $139 7 Visit
Sunbelt Rentals $40–$237 $120–$689 8 Visit
United Rentals varies (contact for quote) varies (contact for quote) 8 Visit

Factors Influencing Rock Drill Hire Prices

Several factors affect the rental costs of rock drills, including the equipment's age, brand, and the rental duration. Additionally, demand fluctuations in the construction industry can impact pricing.

Hidden-Fee Breakdown

When renting a rock drill, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud can also add to the total cost. Late-return penalties and overtime charges should be considered as well.

Our AI app can generate costed estimates in seconds.

rock and drill in construction work

Rock Drill Rental Market Insights 2026

The rock drill rental market in San Antonio is expected to grow, driven by increased construction activities. Vendors are expanding their fleets to include more energy-efficient models, which may influence rental rates. Staying informed about market trends can help in negotiating better rental terms.

Regulatory Compliance Note

Ensure compliance with local regulations when operating rock drills. Proper training and certification may be required for operators, impacting overall project costs.