
In Charlotte, the cost to rent a scaffold tower in 2025 ranges from $50–$100 per day, $200–$400 per week, and $600–$1,200 per month. These rates vary based on the height and type of scaffold tower required. Leading vendors in Charlotte provide a variety of options to suit different project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Sunbelt Rentals | $35–$60 | $175–$350 | 8 | Visit |
| Herc Rentals (H&E Rentals) | approx. $50–$80 | approx. $250–$400 | 7 | Visit |
| BrandSafway Solutions | approx. $40–$70 | approx. $200–$300 | 8 | Visit |
Several factors affect the rental prices of scaffold towers, including the height, material, and duration of hire. Additional features such as adjustable platforms or wheels may also impact costs.
When renting scaffold towers, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat or based on mileage. Fuel surcharges, damage waivers, and cleaning fees for excessive dirt or mud are also common. Late-return penalties and overtime charges should be considered as well.

The scaffold tower rental market in Charlotte is expected to grow steadily in 2025, driven by increased construction activities. Vendors are expanding their inventory to include more versatile and advanced scaffold systems to meet diverse project requirements.
Ensure compliance with local safety regulations when hiring scaffold towers. Proper training and certification may be required for operators, and regular inspections should be conducted to maintain safety standards.
When planning a scaffold tower rental for security system wiring in Charlotte, consider the specific needs of the project. The duration of the rental should align with the wiring schedule to avoid unnecessary costs. Ensure the scaffold tower is equipped with the necessary accessories for cable management and that it can be easily staged in areas with limited access. Proper cleanup and return conditions should be agreed upon to prevent additional charges. Coordinate delivery and pickup times to fit the crew's workflow efficiently.
Tip: Schedule scaffold pickup promptly after wiring completion to avoid extra rental days.