
In 2026, renting a scaffold tower in Colorado Springs for acoustical ceiling installation typically costs between $50–$100 per day, $180–$300 per week, and $360–$360 per month. These rates vary based on the height and type of scaffold tower required. Leading vendors in the area provide a range of options suitable for different project sizes and complexities.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Sunbelt Rentals | $100 | $300 | 8 | Visit |
| Herc Rentals | $100 | $300 | 8 | Visit |
| Waco Scaffolding & Equipment | $100 | $300 | 8 | Visit |
| Robertson Rent‑All Inc. | $60 | $60 | 7 | Visit |
| Allen Rental Tools & Equipment | $38.25 | $115.75 | 7 | Visit |
Several factors affect the cost of hiring scaffold towers, including the height of the tower, the duration of the rental, and any additional features such as guardrails or adjustable platforms. Seasonal demand and availability can also impact pricing.
When renting scaffold towers, be aware of potential hidden fees. These may include delivery and pick-up charges, which can be flat rates or based on mileage. Fuel surcharges, damage waivers, and cleaning fees for excessive dirt or mud may also apply. Additionally, late-return penalties and overtime charges can increase costs if the equipment is not returned on time.

The scaffold tower rental market in Colorado Springs is expected to remain competitive in 2026, with several vendors offering flexible rental terms and competitive pricing. It's advisable to book in advance, especially during peak construction seasons, to ensure availability and secure the best rates.
Ensure that all scaffold towers rented comply with OSHA regulations and local safety standards. Proper training and safety measures should be in place to prevent accidents and ensure a safe working environment.
When planning a scaffold tower rental for acoustical ceiling installation in Colorado Springs, consider the specific height and stability requirements needed for precise ceiling work. Ensure the rental includes necessary accessories like guardrails and toe boards for safety. Plan for efficient staging and access to minimize disruption to other trades. Coordinate delivery and pickup to align with your project timeline, and ensure the crew is briefed on the workflow to maximize efficiency.
Tip: Schedule the scaffold tower return promptly after project completion to avoid unnecessary rental extensions.