Scaffold Tower Rental Fort Worth for Lead Paint Removal | Guide 2025

Price source: Costs shown are derived from our proprietary U.S. construction cost database (updated continuously from contractor/bid/pricing inputs and normalization rules).
Profile image of author
Eva Steinmetzer-Shaw
Head of Marketing

Scaffold Tower Rental Rates Fort Worth 2025

In Fort Worth, renting a scaffold tower for lead paint removal in 2025 typically costs between $100–$150 per day, $400–$600 per week, and $1,200–$1,800 per month. These rates vary based on the height and type of scaffold tower required. Leading vendors in the area provide a range of options suitable for different project sizes and durations.

Vendor Daily Rate Weekly Rate Review Score Website
EZ Equipment Rental (DFW) $111 $111 8 Visit
Robertson Rent‑All Inc. $60 $60 7 Visit
Cal‑West Rentals $100 $300 7 Visit
Rent Construction Fence (Scaffold Tower Rentals) $22 $77 6 Visit
Allen Rental Tools & Equipment $38 $116 6 Visit

Factors Influencing Scaffold Tower Hire Costs

Several factors can affect the rental costs of scaffold towers, including the height of the tower, the rental duration, and any additional features such as safety rails or adjustable platforms. Seasonal demand and specific project requirements, like lead paint removal, may also impact pricing.

Hidden-Fee Breakdown

When renting scaffold towers, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat or based on mileage. Fuel surcharges, damage waivers, and cleaning fees for paint or debris are also common. Additionally, late-return penalties and overtime charges can increase costs if not managed properly.

Our AI app can generate costed estimates in seconds.

scaffold and tower in construction work

Scaffold Tower Rental Market Insights 2025

The scaffold tower rental market in Fort Worth is expected to remain competitive in 2025, with several vendors offering flexible rental terms and competitive pricing. The demand for scaffold towers is likely to increase due to ongoing construction and renovation projects, including those involving lead paint removal.

Regulatory Compliance Note

When renting scaffold towers for lead paint removal, ensure compliance with local safety regulations and guidelines. Proper training and certification may be required for workers handling lead paint, and the scaffold towers must meet specific safety standards.

Scaffold tower rental for lead paint removal in Fort Worth

When planning a scaffold tower rental for lead paint removal in Fort Worth, consider the specific requirements of this hazardous task. The rental duration may need to accommodate thorough preparation and cleanup stages. Ensure the scaffold is equipped with necessary safety accessories, such as guardrails and toe boards. Proper staging and access are crucial to maintain safety and efficiency. Coordinate delivery and pickup to align with project timelines, and ensure the crew is trained in safe lead paint handling procedures.

Practical checklist

  • Verify scaffold tower meets OSHA safety standards for lead paint removal.
  • Schedule rental duration to include setup, work, and cleanup phases.
  • Ensure all crew members have appropriate lead paint handling certification.
  • Plan for secure storage of scaffold components on-site.
  • Coordinate delivery and pickup to avoid project delays.
  • Inspect scaffold for damage or wear before use.
  • Arrange for necessary safety gear and accessories.

Tip: To avoid additional charges, ensure the scaffold tower is thoroughly cleaned and free of lead paint residue before returning.