
In Jacksonville, renting a scaffold tower for asbestos abatement in 2026 typically costs between $100–$150 per day, $400–$600 per week, and $1,200–$1,800 per month. These rates vary based on the height and type of scaffold tower required. Leading local vendors offer a range of options suitable for different project sizes and durations.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Sunbelt Rentals | $35–$60 | $175–$350 | 8 | Visit |
| United Rentals | $35–$60 | $175–$350 | 8 | Visit |
| CAE, Inc. (Florida Scaffolding) | $35–$60 | $175–$350 | 7 | Visit |
| APi National Scaffold | $35–$60 | $175–$350 | 8 | Visit |
Several factors affect the cost of hiring scaffold towers in Jacksonville, including the height of the tower, rental duration, and any additional safety features required for asbestos abatement projects.
When renting scaffold towers, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud can also impact the total cost. Late-return penalties and overtime charges should be considered as well.

The scaffold tower rental market in Jacksonville is expected to remain competitive in 2026, with a steady demand driven by construction and renovation projects, including asbestos abatement. Vendors are likely to offer flexible rental terms and additional services to cater to the specific needs of these projects.
Ensure compliance with local safety regulations when renting scaffold towers for asbestos abatement. Proper training and certification may be required for operators, and vendors can often provide guidance on meeting these requirements.
When planning a scaffold tower rental for asbestos abatement in Jacksonville, consider the specific requirements of the job. The duration of the rental may vary depending on the size and complexity of the abatement project. Ensure that the scaffold tower is equipped with necessary safety accessories and that there is adequate space for staging and access. Proper cleanup and return conditions are crucial to avoid additional charges. Coordinate delivery and pickup times to align with your crew's workflow to minimize downtime.
Tip: Schedule scaffold tower pickup promptly after project completion to avoid unnecessary rental extensions.