
In Nashville, renting a scaffold tower for asbestos abatement in 2025 typically costs between $100–$200 per day, $400–$800 per week, and $1,200–$2,500 per month. These rates vary based on the height and complexity of the scaffold tower required. Leading local vendors offer a range of options to suit different project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Sunbelt Rentals | $100–$150 | $400–$600 | 8 | Visit |
| United Rentals | $100–$150 | $400–$600 | 7 | Visit |
| Capitol City Scaffolding & Equipment Co. | $15–$25 (per section) | $40–$75 (per section) | 7 | Visit |
| ScaffoldBox Nashville | Varies (box rental) | Varies (box rental) | 7 | Visit |
Several factors can affect the rental costs of scaffold towers in Nashville. These include the height of the scaffold, the duration of the rental, and any additional features such as safety rails or adjustable bases. Seasonal demand and specific project requirements, like asbestos abatement, can also impact pricing.
When renting scaffold towers, be aware of potential hidden fees. These may include delivery and pick-up charges, which can be flat or mileage-based, fuel surcharges, and damage waivers versus full insurance. Cleaning fees for concrete or mud, late-return penalties, and overtime charges are also common.

The scaffold tower rental market in Nashville is expected to grow in 2025, driven by increased construction and renovation projects, including asbestos abatement. Vendors are expanding their inventory to meet demand, offering more flexible rental terms and competitive pricing.
When renting scaffold towers for asbestos abatement, ensure compliance with local safety regulations. Proper setup and use are crucial to maintaining safety standards and avoiding potential fines.
When planning to rent a scaffold tower for asbestos abatement in Nashville, consider the specific requirements of the job. The duration of the rental may vary depending on the size and complexity of the project. Ensure that the scaffold tower is equipped with necessary safety accessories and that there is adequate space for staging and access. Proper cleanup and return conditions are essential to avoid additional charges. Coordinate delivery and pickup times to align with your crew's workflow to ensure efficiency.
Tip: To avoid rental friction, ensure the scaffold tower is thoroughly cleaned and inspected before return to prevent additional fees.