
In Washington, renting a scaffold tower for interior painting in 2025 typically costs between $50–$100 per day, $200–$400 per week, and $600–$1,200 per month. These rates vary based on the height and type of scaffold tower required. Leading rental companies in Washington provide a range of options suitable for various project sizes and durations.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Columbia Heights Rental | $72 | $104 | 8 | Visit |
| Allen Rental Tools & Equipment | $38.25 | $115.75 | 7 | Visit |
| Oxon Hill Rentals | $54 | $108 | 7 | Visit |
| Sunbelt Rentals (Washington, DC branch) | $25 | $75 | 8 | Visit |
Several factors affect the cost of hiring scaffold towers, including the height of the tower, rental duration, and any additional features such as guardrails or adjustable platforms. Seasonal demand and location within Washington can also impact pricing.
When renting scaffold towers, be aware of potential hidden fees. These may include delivery and pick-up charges, which can be flat rates or based on mileage. Fuel surcharges, damage waivers, and cleaning fees for paint or debris are also common. Late-return penalties and overtime charges may apply if the equipment is not returned on time.

The scaffold tower rental market in Washington is expected to grow steadily in 2025, driven by increased construction and renovation projects. Rental companies are expanding their inventories to meet demand, offering flexible rental terms and competitive pricing. It's advisable to book in advance to secure the best rates and availability.
Ensure compliance with local safety regulations when using scaffold towers. Proper training and safety equipment are essential to prevent accidents and ensure a safe working environment.
When planning an interior painting project in Washington, renting a scaffold tower can significantly enhance efficiency and safety. Consider the height and reach required for your specific project, as well as any necessary accessories like guardrails or stabilizers. Proper staging and access are crucial, so ensure the scaffold can be easily maneuvered within the space. Plan for delivery and pickup logistics to minimize downtime, and coordinate with your crew to streamline workflow. Rental durations should align with your project timeline to avoid unnecessary extensions.
Tip: Schedule scaffold delivery and pickup during off-peak hours to avoid delays and additional charges.