
In Raleigh, renting a scissor lift for gutter installation in 2026 typically costs between $130–$190 and $150–$260 per day, $300–$700 per week, and $600–$1,400 per month. These rates vary based on the lift's height and capacity. Leading rental companies in Raleigh provide a range of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Sunbelt Rentals | $130 | $362 | 8 | Visit |
| Herc Rentals | $151 | $400 | 9 | Visit |
| EasyLift Scissor Lift Rental | $152 | $346 | 8 | Visit |
| Aerial Lift Rental Pros | $130–$190 | $338 | 8 | Visit |
| National Dispatching | $198 | $445 | 8 | Visit |
Several factors affect the cost of renting a scissor lift, including the lift's model, the rental duration, and any additional services required. Seasonal demand and availability can also impact pricing.
When renting a scissor lift, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud can also add to the total cost. Late-return penalties and overtime charges should be considered as well.

The scissor lift rental market in Raleigh is expected to grow steadily in 2026, driven by increased construction and renovation projects. Rental companies are expanding their fleets to meet demand, offering competitive pricing and flexible rental terms.
Ensure compliance with local safety regulations when operating scissor lifts. Proper training and certification may be required for operators, and rental companies often provide these services.
When planning a scissor lift rental for gutter installation in Raleigh, consider the specific needs of your project. The duration of the rental should align with the scope of the installation, factoring in potential weather delays. Ensure the lift has the necessary height and weight capacity for your crew and materials. Plan for delivery and pickup logistics, especially in residential areas with limited access. Proper staging areas for the lift and materials can streamline workflow and minimize downtime.
Tip: Coordinate delivery and pickup times to avoid residential traffic and ensure smooth logistics.