
In San Antonio, renting a scissor lift for gutter installation in 2026 typically costs between $150–$300 per day, $600–$1,200 per week, and $1,800–$3,500 per month. These rates vary based on the lift's height and capacity. Local vendors offer a range of options suitable for different project sizes.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| EasyLift Scissor Lift Rental | $150–$300 | – | 5 | Visit |
| Tobly Equipment Rental | $190 | $469 | 7 | Visit |
| AE Rental | $150 | $350 | 8 | Visit |
| Aerial Lift Rental Pros | $141–$233 | $328–$589 | 6 | Visit |
| BigRentz | $97–$210 | $230–$533 | 7 | Visit |
Several factors affect the rental costs, including the lift's model, the rental duration, and any additional features required for specific tasks like gutter installation.
Be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud can also impact the total cost. Late-return penalties and overtime charges should be considered when planning your rental period.

The demand for scissor lifts in San Antonio is expected to grow, driven by increased construction and maintenance projects. This growth may influence rental availability and pricing. It's advisable to book in advance to secure the best rates.
Ensure compliance with local safety regulations when operating scissor lifts. Proper training and certification may be required for operators to ensure safe and efficient use.
When planning a scissor lift rental for gutter installation in San Antonio, consider the specific needs of your project. The duration of the rental should align with the installation schedule, accounting for any potential delays. Ensure the lift has the necessary height and weight capacity for your crew and materials. Plan for efficient staging and access to the work area, and confirm delivery and pickup logistics to avoid disruptions. Proper cleanup and return conditions should be discussed to prevent additional charges.
Tip: Schedule the lift return promptly after project completion to avoid extra rental days.