December 4, 2025
 —  
Equipment Hire

Shoring Box Rental Houston | Guide 2025

Profile image of author
Denise Ellison
Head of Marketing

Shoring Box Rental Rates Houston 2025

In Houston, renting a shoring box for stormwater retention systems in 2025 typically costs between $150–$300 per day, $600–$1,200 per week, and $2,000–$4,500 per month. These rates vary based on the size and type of the shoring box required for specific project needs. Leading rental companies in Houston provide a range of options to accommodate different site conditions and project durations.

Vendor Daily Rate Weekly Rate Review Score Website
Aztec Rental Center $12 $36 7 Visit
Sunbelt Rentals (Trench Safety, Houston) $148 $429 8 Visit
4‑Horn Trench & Shoring $170 $493 8 Visit

Factors Influencing Shoring Box Hire Costs in Houston

Several factors affect the rental costs of shoring boxes, including the depth and width of the excavation, soil conditions, and the duration of the rental period. Customization options and additional safety features may also impact pricing.

Hidden-Fee Breakdown

When renting shoring boxes, be aware of potential hidden fees such as delivery and pick-up charges, which can be flat rates or based on mileage. Fuel surcharges, damage waivers, and cleaning fees for returning equipment in less-than-pristine condition may also apply. Late-return penalties and overtime charges for extended use should be considered in budgeting.

Our AI app can generate costed estimates in seconds.

shoring and box in construction work

Shoring Box Rental Market Insights 2025

The demand for shoring boxes in Houston is expected to rise due to increased construction activities and infrastructure projects. Rental companies are expanding their inventories to meet this demand, offering more competitive pricing and flexible rental terms.

Regulatory Compliance Note

Ensure compliance with local regulations and safety standards when using shoring boxes. Proper installation and use are critical to maintaining site safety and avoiding potential fines or project delays.