
In Dallas, renting a telehandler for structural steel erection in 2026 typically costs between $300 and $600 per day, $1,150 to $1,850 per week, and $2,500 to $4,300 per month. These rates vary based on the telehandler's capacity and reach. Leading rental companies in Dallas provide a wide range of telehandlers suitable for various construction needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| EZ Equipment Rental (DFW) | $325 | $1,300 | 8 | Visit |
| AARental (Genie GTH5519) | $335 | $1,005 | 8 | Visit |
| A Rentco (Telehandler GTH‑5519) | $335 | $1,005 | 7 | Visit |
| Tobly Equipment Rental | $500 | $1,100 | 7 | Visit |
| Texas Ground Up Rental | $1,420 | $2,875 | 7 | Visit |
Several factors affect telehandler rental costs, including the machine's lifting capacity, reach, and the rental duration. Additional features like four-wheel drive or advanced safety systems can also impact pricing.
When renting a telehandler, be aware of potential hidden fees. These may include delivery and pick-up charges, which can be flat or mileage-based, fuel surcharges, and insurance options like damage waivers. Cleaning fees for excessive dirt or mud, late-return penalties, and overtime charges are also common.

The telehandler rental market in Dallas is expected to grow in 2026, driven by increased construction activities. Rental companies are expanding their fleets to include more versatile and efficient models to meet demand.
Ensure compliance with local regulations when renting telehandlers. Operators must be certified, and equipment should meet safety standards to avoid fines and ensure job site safety.
When planning a telehandler rental for structural steel erection in Dallas, consider the specific needs of your project. The duration of the rental should align with your project timeline, ensuring that the telehandler is available when needed for lifting and positioning steel components. Consider any necessary attachments that might be required for handling different steel sizes and shapes. Plan for efficient delivery and pickup to minimize downtime, and ensure the equipment is staged correctly to facilitate smooth workflow for your crew.
Tip: Schedule telehandler return immediately after project completion to avoid additional rental days.