Vacuum Pump Rental San Jose | Guide 2026

Price source: Costs shown are derived from our proprietary U.S. construction cost database (updated continuously from contractor/bid/pricing inputs and normalization rules).
Profile image of author
Eva Steinmetzer-Shaw
Head of Marketing

Vacuum Pump Rental Rates in San Jose 2026

In San Jose, renting a vacuum pump for HVAC installation in 2026 typically costs between $100–$200 per day, $400–$800 per week, and $1,200–$2,500 per month. These rates vary based on the pump's capacity and features. Leading rental companies in the area provide a range of options suitable for different project sizes and requirements.

Vendor Daily Rate Weekly Rate Review Score Website
D & D Compressor, Inc. $100 $400 8 Visit
CASEI $237 $400 7 Visit
Sunbelt Rentals $237 $689 8 Visit
United Rentals $120 $700 9 Visit

Factors Influencing Vacuum Pump Hire Prices

Several factors affect the rental costs of vacuum pumps, including the pump's size, brand, and the duration of the rental. Additionally, seasonal demand and availability can impact pricing.

Hidden-Fee Breakdown

When renting a vacuum pump, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for equipment returned in poor condition can also add to the total cost. Late-return penalties and overtime charges should be considered as well.

Our AI app can generate costed estimates in seconds.

vacuum and pump in construction work

Vacuum Pump Rental Market Insights 2026

The rental market for vacuum pumps in San Jose is expected to remain competitive in 2026, with several vendors offering flexible rental terms and competitive pricing. It's advisable to book in advance, especially during peak HVAC installation seasons, to secure the best rates and availability.

Regulatory Compliance Note

Ensure that all rented equipment complies with local regulations and safety standards. Proper training and certification may be required for operators, depending on the equipment's complexity and the project's scope.