
In Kansas City, renting a scaffold tower in 2026 typically costs between $100–$150 per day, $350–$500 per week, and $1,000–$1,500 per month. These rates vary based on the height and type of scaffold tower required. Leading vendors in the area provide a range of options suitable for different project needs.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| Robertson Rent‑All Inc. | $60 | $60 | 8 | Visit |
| Oak Grove Rental (serving Kansas City metro) | $35 | $70 | 7 | Visit |
| Allen Rental Tools & Equipment | $38.25 | $115.75 | 7 | Visit |
| KC Scaffold | Contact for rates | Contact for rates | 7 | Visit |
| Sunbelt Rentals (North Kansas City branch) | Varies by quote | Varies by quote | 8 | Visit |
Several factors affect the cost of hiring scaffold towers, including the height, duration of rental, and any additional features such as guardrails or adjustable bases.
Be aware of potential hidden fees such as delivery and pick-up charges, which can be flat or mileage-based. Fuel surcharges, damage waivers, and cleaning fees for concrete or mud can also add to the total cost. Late-return penalties and overtime charges may apply if the equipment is not returned on time.

The scaffold tower rental market in Kansas City is expected to grow, driven by increased construction and renovation projects. Understanding the rental terms and conditions is crucial for managing costs effectively.
Ensure compliance with local safety regulations when using scaffold towers. Proper training and safety measures are essential to prevent accidents and ensure a safe working environment.
When planning a scaffold tower rental for lead paint removal in Kansas City, consider the specific requirements of this task. The duration of the rental may be extended due to the meticulous nature of lead paint removal. Ensure that the scaffold tower is equipped with the necessary safety accessories, such as guardrails and toe boards. Proper staging and access are crucial to facilitate efficient workflow and minimize downtime. Additionally, coordinate delivery and pickup times to align with project schedules, and ensure the equipment is returned in clean condition to avoid additional fees.
Tip: Schedule scaffold tower delivery during off-peak hours to avoid traffic delays and ensure timely setup.