
In Oklahoma City, renting a scissor lift for gutter installation in 2025 typically costs between $150–$300 per day, $600–$1,200 per week, and $1,800–$3,500 per month. These rates vary based on lift height and model. Local vendors offer a range of options suitable for different project sizes and requirements.
| Vendor | Daily Rate | Weekly Rate | Review Score | Website |
|---|---|---|---|---|
| United Rentals | $278 | $738 | 8 | Visit |
| EquipmentRentalPros (via local vendors) | $125 | $364 | 7 | Visit |
| EasyLift Scissor Lift Rental | $150 | $1,050 | 8 | Visit |
| RentalForce (aggregated local pricing) | $65 | $615 | 6 | Visit |
Several factors affect the rental costs of scissor lifts in Oklahoma City. These include the lift's height, weight capacity, and additional features such as rough terrain capabilities. Seasonal demand and rental duration also play significant roles in pricing.
When renting a scissor lift, be aware of potential hidden fees. These can include delivery and pick-up charges, which may be flat or mileage-based, fuel or recharge surcharges, and damage waivers versus full insurance. Additionally, cleaning fees for concrete or mud, late-return penalties, and overtime hours can add to the overall cost.

The scissor lift rental market in Oklahoma City is expected to remain competitive in 2025, with several vendors offering flexible rental terms and competitive pricing. It's advisable to book in advance, especially during peak construction seasons, to secure the best rates and availability.
Ensure compliance with local safety regulations when operating scissor lifts. Proper training and certification are essential for operators to prevent accidents and ensure safe operation on job sites.
When planning a scissor lift rental for gutter installation in Oklahoma City, consider the specific needs of your project. The duration of the rental should align with the installation schedule, accounting for any potential delays. Ensure the lift has the necessary height and weight capacity for your crew and materials. Plan for efficient delivery and pickup to minimize downtime, and confirm that the site is accessible for the equipment. Proper staging areas for the lift and materials can streamline the workflow and reduce installation time.
Tip: To avoid rental friction, ensure the lift is returned clean and in good condition to prevent additional charges.