December 6, 2025
 —  
Equipment Hire

Stamp Mats Rental Boston | Guide 2025

Profile image of author
Denise Ellison
Head of Marketing

Stamp Mats Rental Rates Boston 2025

Renting stamp mats for a stamped concrete patio in Boston in 2025 typically costs between $50–$100 per day, $200–$400 per week, and $600–$1,200 per month. These rates vary based on the pattern complexity and the number of mats required. Leading rental companies in Boston provide a wide selection of patterns to suit various design needs.

Vendor Daily Rate Weekly Rate Review Score Website
White Cap $300 $1 050 8 Visit
Stampcrete of Middlesex $300 $1 050 7 Visit
Massachusetts Contractor Supply $300 $1 050 7 Visit
Perry Concrete Forming Supply $300 $1 050 7 Visit
Sealant Depot Inc. $300 $1 050 8 Visit

Factors Influencing Stamp Mats Hire Prices in Boston

Several factors affect the rental costs of stamp mats, including the intricacy of the design, the duration of the rental, and the availability of the mats. Seasonal demand can also impact pricing, with higher costs during peak construction periods.

Hidden-Fee Breakdown

When renting stamp mats, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or mileage-based. Additional costs might include cleaning fees for concrete residue, damage waivers, or full insurance options. Late-return penalties and overtime charges can also apply if the mats are not returned on time.

Our AI app can generate costed estimates in seconds.

stamp and mats in construction work

Stamp Mats Rental Market Insights 2025

The Boston rental market for stamp mats is competitive, with several vendors offering flexible rental terms and a variety of patterns. It's advisable to book in advance, especially during the busy spring and summer months, to ensure availability and secure the best rates.

Regulatory Compliance Note

Ensure compliance with local regulations regarding stamped concrete installations. Some areas may require specific permits or adherence to environmental guidelines, which can affect project timelines and costs.