Stamp Mats Rental Las Vegas | Guide 2025

Price source: Costs shown are derived from our proprietary U.S. construction cost database (updated continuously from contractor/bid/pricing inputs and normalization rules).
Profile image of author
Eva Steinmetzer-Shaw
Head of Marketing

Stamp Mats Rental Rates Las Vegas 2025

Renting stamp mats in Las Vegas for a stamped concrete patio in 2025 typically costs between $50–$100 per day, $200–$400 per week, and $600–$1,200 per month. These rates vary based on the pattern and size of the mats. Leading rental companies in Las Vegas provide a wide selection of designs to suit various project needs.

Vendor Daily Rate Weekly Rate Review Score Website
Concrete Accessories Inc $300 $1 800 9 Visit
Sepulveda Building Materials $200 $1 200 7 Visit
Badger Contractors Rental & Supply, LLC $145 $412 6 Visit

Factors Influencing Stamp Mats Hire Prices

Several factors affect the rental costs of stamp mats, including the complexity of the pattern, the number of mats required, and the rental duration. Seasonal demand can also impact pricing, with higher rates during peak construction periods.

Hidden-Fee Breakdown

When renting stamp mats, be aware of potential hidden fees such as delivery and pick-up charges, which may be flat or based on mileage. Additional costs might include cleaning fees for concrete residue, damage waivers, or full insurance options. Late-return penalties and overtime charges can also apply if the mats are not returned on time.

Our AI app can generate costed estimates in seconds.

stamp and mats in construction work

Stamp Mats Rental Market Insights 2025

The Las Vegas rental market for stamp mats is competitive, with several vendors offering flexible rental terms and a variety of patterns. It's advisable to book in advance, especially during the busy spring and summer months, to secure the best rates and availability.

Regulatory Compliance Note

Ensure compliance with local regulations regarding stamped concrete installations. Some areas may require specific permits or adherence to environmental guidelines, which can affect project timelines and costs.